Step 1:Install the joist on the cement floor, and the gap between two adjacent joists is no more than 35cm.When the decking is to an end, please use two joists and gap between them is at least 5mm.
Step 2:Install the first decking.Side-to-side gap between boards, End-to-end gap between boards, End-to-object gap is at least 5mm.
Step 3: After pre-drilling on the joists, install the fasteners.Fix one fastener into the side slot, and then push another decking to the fasteners.Or slide the SY plastic fastener into the side slot and fix them with screws,Repeat this step to the end.When the left site is not enough to put a whole decking, it can be cuted according to the desired size to finish installation. Remember to reserve the 5mm gap.
Step 4:Align the edge cover along side the decking edge and screw vertically.
Learn about installing HOHEcotech WPC decking by checking out our Installation Guide video.